Hook up offshore platform






Specification
 Truck : International
 Rated single line pull winch : 25,000lb
 Rated mast capacity (vertical) : 65,000lb
 Rated mast capacity (slant) : N/A
 Length  (O/all) : 45'-10" 1/2" ()
 Width (O/all) : 8'-6" ()
 Wheel base : " ()
 Height : 14'-3" ()
Weight rear (no fluid)
Weight front (no fluid)
 
Truck Specifications
 Tandem steer tridem drive : Paystar 5900i
 
Engine :
International Maxxforce
 Model A475
 Displacement litre
 
Transmission :
 "Eaton Road Ranger"
 18 speed manual
 RTLOF-16918B
 
Mast Specifications
 Load rating (Vertical) : 65,000lb
 Load rating (Slant) : N/A
 Mast height (from ground) : 76'-3" ()
 Mast height (to underside of crown : 73'-2" ()
 Crown (two sheave) : 2 x 24" diameter
 
Traveling Block Specifications
 Model : C-TECH_FBB25T
 Capacity : 25 ton
 Grooving : 7/8" diameter
 
Drawworks
 Model : CH-230
 Motor : Rexroth
 Capacity : 25,000#
 Grooving 7/8"
 Max. drum speed (at max. volume) : 250 rpm
 
Hydraulic Specifications
 Usable tank capacity : 175 gal (800 litres)
 
Triple Vane Specifications :
 Section 1 :
1100psi max wp
 50gpm max flow
 
Section 2 :
2500psi max wp
 31gpm max flow
 
Section 3 :
1500psi max wp
 10gpm max flow
 
Pressure compension pump :
 3000psi max wp
 300gpm max flow
 
Gear pump :
 2000psi max wp
  max flow
 
Service Winch
 Model : Braden Gearmatic
 Capacity : 5,000# (bare drum) at max pressure
 Wire rope dia. : 3/8" diameter
 Speed : 183FPM (full drum at max pressure)
 
Tank Specifciations (Jasper)
 Max. tank capacity : 8,120 litres
 Material : Aluminum
 Code : T406
 Product : Oil / water / produced water
 Design Pressure : mwap
 Length (seam-seam) : 112"
 Width (O/all) : 96"
 Height : "
 
Pump Specifications
 Model : TEEF 3 x 5
 Horse Power (continuous) : 125hp
 Horse Power (intermittent) : 165hp
 Plunger : 3" Hardco
 Max. pressure : 6220psi @ 50rpm
 Max. flow rate : 138pm @ 300rpm
 
It has approximately 2500 working hours.
 
Price & terms : Please enquire using the email form below.

As well as being a major sub-project in terms of cost and time, the offshore phase has additional significance because, firstly, it is the "final hurdle" before obtaining a return on the total capital investment and, secondly, it is the most publicly visible and newsworthy part of the development. Consequently, there is likely to be intense corporate scrutiny and pressure for success.


Hook up offshore platform

Hook up offshore platform



TOP PROJECT of 2006

Pic 1